Project

Details

SCE&G – Power Delivery Operations

Client

SCE&G

Location

Cayce, SC

Size (SQ FT)

69,000 SF

Technical Considerations

SCE&G – Power Delivery Operations

Description

A five-building complex supporting the high line transmission and electric substation construction groups. The 33,000 SF office facility has space for crew quarters, engineering, surveying, right-of-way and management groups, as well as training rooms and cooking facilities that can be used during power outages. A 36,000 SF storeroom was designed to utilize cantilevered racks for flexible storage capabilities, and includes scales, pallet shrink-wrap equipment and electric and propane fork lifts. Also included on-site are two covered storage buildings and a laydown yard.